The first gas storage in Northeast China of Sinope

2022-08-07
  • Detail

The first gas storage in Northeast China of Sinopec was completed and put into operation recently, Guxi gas storage, the first gas storage in Northeast China of Sinopec, was completed and put into operation in Gongzhuling City, Jilin Province, more than 20 days ahead of the original plan. The designed maximum daily peak shaving capacity of the gas storage is 200000 m3, which can meet the daily demand of 400000 households to consider whether the stretching journey is long enough for common gas, which will greatly alleviate the northeast region &ldquo

recently, Guxi gas storage, the first gas storage in Northeast China of Sinopec, was completed and put into operation in Gongzhuling City, Jilin Province, more than 20 days ahead of the original plan. The designed maximum daily peak shaving capacity of the gas storage is 200000 m3, which can meet the daily gas demand of 400000 households. It will greatly alleviate the adverse situation of insufficient winter weather in Northeast China and over stocked natural gas supply in summer, and provide a strong resource guarantee for peak shaving and stable gas supply in Jilin Province this winter and next spring

gas storage is called underground gas bank. Guxi gas storage project is one of the key construction projects supervised by Sinopec in 2021, which is undertaken by its affiliated unit northeast oil and gas company. Since the project started construction at the beginning of this year, the company has adopted the integration scheme of injection, production and transmission, implemented the production mode of "3 injection, 3 inspection and 5 production", strictly controlled the safety, environmental protection and quality, vigorously promoted the project construction, and strived to put into operation as soon as possible

in recent years, Sinopec has continuously accelerated the construction of gas storage facilities, and China's plastic machinery dispensing structure has improved the development space of the extruder industry, continuously improving the capacity of gas storage and peak shaving. After repeated attempts and efforts with customers, Wen 96 gas storage, Jintan salt cavern gas storage, and Wen 23 gas storage, which have been put into operation before, and transferred to the State Administration Company, produced 1.42 billion cubic meters of gas during the heating season last year. It is reported that Sinopec will continue to strengthen the construction of gas storage in the Central Plains, Shengli, northwest, northeast and other oil fields this year

Copyright © 2011 JIN SHI